How to Pour Concrete Footings: Depth, Forms and Rebar

How to Pour Concrete Footings: Depth, Forms and Rebar

Footings are the least glamorous part of any outdoor build and the most expensive to fix later. A deck post that heaves an inch every winter or a shed corner that sinks after a wet spring almost always sits on a footing that was too shallow, too small or poured on loose soil. Learning how to pour concrete footings correctly comes down to four things: digging to the right depth, getting the hole or trench inspected, placing reinforcement properly, and curing the concrete slowly. The work is physical but straightforward for sheds, decks and porches. Additions are a different level and usually belong to a contractor.

Here is the overview: check with your building department about permits and required depth, call 811 so buried utilities are marked, dig to undisturbed soil beneath the local frost line, form the footing with cardboard tubes or a trench, set rebar on supports so it sits inside the concrete, schedule the inspection before you pour, then place, consolidate and keep the concrete moist for several days.

How to Pour Concrete Footings: Permits and Planning

Most jurisdictions require a permit for attached decks, porches and additions, and many require one for larger sheds. The permit sets the footing size, depth and spacing for your soil and climate, and it typically includes a footing inspection after the hole is dug and the rebar is in place but before any concrete goes in. Follow your local building department’s rules; requirements vary widely by region, so ask for their deck or footing handout rather than relying on generic numbers. If you belong to an HOA, check its rules too.

Plan footing locations from your structure’s drawings. Post footings for decks are spaced to match beam spans, while sheds may use a perimeter trench, piers at corners and midpoints, or a gravel pad. Mark locations with stakes and string lines, and check that diagonals measure equal so the layout is square.

Call 811 Before You Dig

Call 811 or submit an online request a few business days before digging. Utility companies will mark buried gas, electric, water and communication lines with paint or flags for free. Hitting a gas or power line with a shovel or auger can be deadly. Hand dig carefully within the tolerance zone around marked lines, typically about 18 inches on each side, and remember that private lines such as a line to a detached garage or a sprinkler system are not marked by 811.

Safety: Wet Concrete, Dust and Heavy Lifting

Wet concrete is highly alkaline and causes chemical burns that may not be felt until hours later. Wear waterproof gloves, safety glasses, long sleeves and tall rubber boots, and tuck pants into or over the boots so concrete cannot get inside. Rinse any skin contact with clean water promptly, and flush eyes for at least 15 minutes and seek medical help if splashed. Dry cement creates silica dust when you rip open bags; wear an N95 or P100 respirator while mixing, and use a wet saw and respirator if you cut concrete or masonry.

Bags of concrete mix are heavy, often 60 to 80 pounds. Lift with your legs, use a wheelbarrow or hand truck, and get help. Power augers can twist violently if they bind on a root or rock; use a two-person auger or one with a torque arm, and keep loose clothing away.

Frost-Line Depth and Footing Size

In cold climates, water in the soil freezes and expands, lifting anything that sits within the frozen zone. Footings must bottom out beneath the frost line so they rest on soil that never freezes. Frost depth ranges from a few inches in the warmest regions to several feet in northern states; your building department publishes the local figure. Always dig to undisturbed native soil, not loose fill, even in mild climates.

Footing width depends on the load and the soil’s bearing capacity. Wider footings spread weight over more soil. Many deck footings are poured with a wider base, either by flaring the bottom of the hole or by using a bell-shaped plastic footing form attached to the bottom of a tube. Follow the size your permit or plans specify.

Forming Tubes vs Trench Footings

Cardboard Forming Tubes

For decks, porches and pier-supported sheds, cylindrical cardboard forming tubes are the standard. Dig a hole a few inches wider than the tube to the required depth, set a bell footing form or pour a base pad if your plan calls for one, then place the tube, plumb it and backfill around it to hold it steady. Tubes usually stick up a couple of inches past grade so water drains away from the post base. Common diameters are 8, 10 and 12 inches.

Trench Footings

Continuous trench footings support walls, larger sheds, garages and additions. Dig a trench to the required depth and width with straight sides and a flat, undisturbed bottom. In firm soil, the trench walls themselves can act as the form (an earth-formed footing). In loose soil or where the footing rises out of the ground, build wood forms from 2x lumber staked on both sides. Level the tops of the forms with a builder’s level or laser so the footing top is flat.

Rebar Placement

Reinforcing steel keeps footings from cracking apart under load and ties them to the structure it carries. Your plans will specify bar size and placement. A few universal rules apply.

  • Rebar must be surrounded by concrete, not resting on soil. Support horizontal bars on rebar chairs or concrete bricks (dobies) so they sit about 3 inches off the bottom of the excavation, with similar cover on the sides.
  • Overlap bars at splices by the length your plans specify, and tie them together with wire.
  • In trench footings, bend bars around corners or add corner bars so reinforcement is continuous.
  • Set vertical bars or anchor bolts at the locations your plans show, held in position so they do not shift during the pour.
Looking to buy How to Pour Concrete Footings? Compare top-rated options.
Shop on Amazon →Browse Our Shop
As an Amazon Associate we earn from qualifying purchases.

The Inspection Before the Pour

Once holes or trenches are dug, forms are set and rebar is in place, call for the footing inspection if your permit requires one. The inspector checks depth, width, soil condition and reinforcement. Do not pour until you pass; concrete poured before an inspection may have to be removed. Keep the excavation free of water and loose soil while you wait, and cover it if rain is expected.

Step-by-Step Pour

  1. Order or mix concrete. For a few tubes, bagged concrete mixed in an electric cement mixer is efficient. For trench footings or many piers, a ready-mix delivery saves enormous labor. Calculate volume with an online calculator and add about 10 percent.
  2. Mix consistently. In a mixer, add most of the water first, then the bags, and mix for 3 to 5 minutes until uniform. Aim for a workable mix that holds its shape, not soup. Extra water weakens concrete.
  3. Place the concrete. Fill tubes or trenches in lifts of about 12 inches. After each lift, rod it with a length of rebar or tap the forms with a hammer to release air pockets.
  4. Set hardware. Insert anchor bolts or post bases while the concrete is still wet, checking position and plumb against your string lines.
  5. Strike off and finish. Screed the top flush with the tube or form and slope it slightly so water runs off.
  6. Cure. Keep the concrete damp for at least 3 to 7 days by covering it with plastic or wet burlap, especially in hot, dry weather. Protect fresh concrete from freezing in cold weather.

An electric cement mixer is a smart rental or purchase for projects with more than a handful of bags. It produces a more consistent mix than hand mixing in a wheelbarrow and saves your back.

Curing Times and Building on Footings

Concrete gains strength gradually. Light framing can often begin after a few days, but concrete reaches its design strength around 28 days. Avoid placing heavy loads, such as a masonry wall or a fully loaded deck, until it has cured for at least a week, and follow your plans or inspector’s guidance. Peel away exposed cardboard tube that sits out of the ground once cured.

Troubleshooting

  • Water in the hole: pump or bail it out and remove soft mud before pouring.
  • Hole too deep in loose soil: do not backfill with loose dirt. Fill the extra depth with concrete or compacted gravel as your inspector allows.
  • Tube shifted during the pour: brace tubes with stakes and backfill before pouring.
  • Honeycombing on exposed sides: the concrete was not consolidated. Rod each lift thoroughly.

When to Call a Licensed Professional

Hire a licensed contractor or structural engineer for footings that support a home addition, a second-story deck, a retaining wall, or any structure on expansive clay, steep slopes or fill soil. Additions in particular involve foundation walls, drainage and connection to the existing house that go beyond pier footings. Any electrical or plumbing lines running through the footing area must be handled by licensed trades. For sheds and ground-level decks, a careful DIYer with a permit, an inspection and the right equipment can do the job well.

Anyone weighing how to pour concrete footings for a first project should start small, with a shed or low deck, before tackling anything attached to the house. Costs vary by size and region. Bagged concrete, tubes and rebar for a small deck are relatively affordable, while a ready-mix truck has a minimum charge and footing work for additions runs into the thousands. Equipment rentals such as a power auger and mixer add a moderate daily cost.

Frequently Asked Questions

How deep should concrete footings be?

Footings must reach undisturbed soil beneath your local frost line, which ranges from a few inches to several feet. Your building department sets the required depth for your area.

Do I need a permit to pour footings for a deck?

Most jurisdictions require a permit for attached decks, porches and additions, often with a footing inspection before the pour. Check with your local building department.

Do concrete footings need rebar?

Many do, particularly trench footings and those supporting heavy loads. Rebar should sit on chairs about 3 inches off the soil. Follow the reinforcement your plans specify.

Should I use forming tubes or a trench footing?

Tubes suit individual piers for decks, porches and some sheds. Trench footings support continuous walls, larger sheds, garages and additions.

How long should concrete footings cure before building?

Keep them moist for 3 to 7 days. Light framing can often start after a few days, but wait at least a week before heavy loads; full strength takes about 28 days.