A door that binds, swings open on its own, or leaves an uneven gap at the top is almost never the door’s fault. It is the installation. Getting interior door installation right comes down to one skill: setting a plumb, square, and level frame using shims, and everything else follows from there. Do that part carefully and the door will latch cleanly and hang perfectly for decades.
Part of our Windows & Doors guide — explore the full guide →
This guide walks through both pre-hung and slab installs, the tools you need, and the small tricks that separate a professional-looking result from a DIY job that looks off.
- Pre-Hung Versus Slab Doors
- Tools and Materials You Will Need
- Installing a Pre-Hung Door Step by Step
- Hanging a Slab Door
- Getting the Reveal and Swing Right
- Trimming and Finishing
- Measuring the Rough Opening
- Handling and Swing Direction
- Working With Out-of-Plumb Walls
- Tips for a Faster, Cleaner Install
- Common Mistakes to Avoid
- Indoor Door Installation Checklist: What to Measure Before You Buy
Pre-Hung Versus Slab Doors
Your first decision is which type to buy. A pre-hung door arrives already mounted on hinges inside a complete frame, so you install the whole assembly into the rough opening. A slab is just the door panel, which you hang on an existing frame using the old hinge locations.
For most homeowners replacing an old frame or building new, a pre-hung is far easier because the hinge geometry is done for you. A slab makes sense only when your existing jamb is straight and solid and you simply want a fresh door. Pre-hung interior doors run $90 to $250 at Home Depot or Lowe’s, while a bare slab starts around $40.
Tools and Materials You Will Need
Gather everything before you start so you are not running to the garage mid-job. A typical single-door install takes one to two hours once you have done a couple.
- 4-foot level and a 6-foot level if you have one
- Cordless drill and a set of shims (cedar or composite)
- Finish nailer or 8d and 6d finish nails plus a hammer
- Utility knife, tape measure, and a pry bar
- 3-inch screws to replace one screw per hinge for strength
- Wood glue and a nail set for hand-nailing
Confirm your rough opening is roughly 2 inches wider and 2 inches taller than the door slab. A standard 30-inch door needs about a 32-inch rough opening.
Installing a Pre-Hung Door Step by Step
Work slowly on the hinge side. That jamb is your reference, and if it is plumb, the rest falls into place.
- Set the frame into the opening and center it, checking that the jamb sits flush with the wall surface on both sides.
- Shim behind the top hinge and drive a nail through the jamb and shims into the stud. Do not sink it fully yet.
- Hold your level against the hinge jamb and adjust shims until it reads perfectly plumb, then nail off the middle and bottom hinges.
- Close the door and inspect the reveal, the gap between door and frame. It should be an even 1/8 inch all the way around.
- Shim and nail the latch-side jamb, tuning shims until the reveal is uniform top to bottom.
- Replace one screw in the top hinge with a 3-inch screw driven into the framing stud to prevent future sag.
Score the shims with a utility knife and snap off the excess flush with the jamb before you trim.
Hanging a Slab Door
If you are reusing a frame, take the old door down and lay it on top of the new slab. Transfer the hinge mortise locations and the latch bore with a pencil. Then chisel the hinge mortises to depth, roughly 1/8 inch, and drill a 2-1/8 inch hole for the knob with a hole saw.
Test-fit before finishing. A properly cut slab drops onto the existing hinge pins and swings freely. Plane the strike edge slightly if it binds, and always leave a 1/2 inch gap at the bottom for carpet clearance.
Getting the Reveal and Swing Right
The reveal is where amateurs give themselves away. An even 1/8 inch gap on all three sides means the frame is square. If the top gap is wedge-shaped, your frame is racked and needs a shim adjustment before you trim.
A door that swings open or closed on its own is out of plumb from front to back. Tilt the hinge jamb a hair toward or away from the swing and the door will stay wherever you leave it. This is normally a two-minute shim tweak.
Trimming and Finishing
Once the frame is set and the door swings true, install the casing. Miter the corners at 45 degrees and set a consistent 3/16 inch reveal between the jamb edge and the casing. Nail the casing to both the jamb and the wall framing with 6d and 8d finish nails.
Fill nail holes with wood filler, caulk the casing-to-wall seam, and prime any bare wood before painting. If you bought a paint-grade door, a coat of primer and two finish coats give the crispest result.
Measuring the Rough Opening
Accurate measurements up front prevent the most frustrating surprises. The rough opening is the framed hole in the wall, measured stud to stud and header to subfloor, before any jamb or trim goes in. For a pre-hung door, that opening needs to be about 2 inches wider and 2 inches taller than the door slab itself to leave room for shimming.
Standard door slabs come in 2-inch width increments: 24, 28, 30, 32, and 36 inches, all at 80 inches tall. So a 32-inch door wants a rough opening near 34 inches wide and 82 inches tall. Measure the opening in three spots across the width and height, since framing is rarely perfectly square, and work from the smallest reading so the frame drops in cleanly.
Handling and Swing Direction
Before you buy, decide which way the door should swing, because a pre-hung door is built for a specific handing and cannot be flipped. Stand in the opening facing the direction the door opens away from you. If the hinges are on your left, it is a left-hand door; on your right, a right-hand door.
Think through how the door should live in the room. It should swing into the room, not out into a hallway, and it should not block a light switch or crash into an adjacent door. Getting the handing wrong means a return trip to the store, so confirm it twice before you leave with the door.
Working With Out-of-Plumb Walls
Real houses settle, and older homes especially have walls that lean out of plumb. When the wall itself is tilted, forcing the door frame to match the wall guarantees a door that swings on its own or gaps unevenly. The frame must be set plumb and level regardless of what the wall is doing.
Where the wall leans, you will see a gap between the jamb and the drywall on one side. That is normal and expected; you fill it with shims behind the casing and cover the transition with the trim. Trust your level over the wall every time. A door hung plumb in a slightly crooked wall looks and works right, while a door hung to match a crooked wall looks wrong forever.
Tips for a Faster, Cleaner Install
After enough doors, you pick up small habits that save real time and produce a sharper result. These are the tricks that separate an efficient install from a frustrating afternoon of fighting a door that will not cooperate.
- Set the frame with the door closed and a couple of shims wedged in the reveal to hold spacing while you nail
- Use composite shims rather than cedar in high-humidity areas, since wood shims can compress over time
- Keep a pair of shims together, one from each side, and slide them past each other to fine-tune thickness
- Tack the frame with just a couple of nails first, test the swing, then nail off fully once it is perfect
- Pre-drill hinge screws in hardwood jambs to keep the wood from splitting
Another time-saver is to dry-fit everything before you commit. Stand the pre-hung unit in the opening, check that it sits flush with the wall on both faces, and confirm the door clears the floor and any carpet before you drive a single nail. Catching a problem at the dry-fit stage takes seconds, while catching it after the frame is nailed and shimmed means prying everything back out. A little patience up front is what makes the difference between a door that operates flawlessly for decades and one you are constantly adjusting.
Common Mistakes to Avoid
The biggest error is nailing the frame tight before checking plumb, which locks in a crooked door you then fight forever. The second is forgetting the long hinge screw, which lets a heavy door sag within a year. Take your time on the hinge jamb, verify every reveal, and your interior door installation will look like it came from a finish carpenter, not a weekend warrior.
Indoor Door Installation Checklist: What to Measure Before You Buy
Most frustrating indoor door installation jobs go wrong in the store, not in the doorway. Rough opening size and swing direction are covered above, but several other measurements decide whether the new door fits your wall, your hardware, and your floor. Run through this list before you buy, whether you are replacing one inside door or several.
- Wall thickness (jamb width): Measure from the face of the drywall on one side to the face on the other. A pre-hung frame needs to match this so the jamb sits flush with both wall surfaces, as the installation steps require. Standard interior walls usually match stock jambs, but older plaster walls and walls with thicker framing often do not and may need a wider jamb or jamb extensions.
- Floor height, now and later: If you plan new flooring, especially thicker tile or hardwood, factor it in now. Set the door for the finished floor height, not the current one, so you are not trimming the bottom of the slab later.
- Existing hardware: If you want to reuse knobs or levers, measure the backset (the distance from the door edge to the center of the knob hole) and the bore diameter, and buy a door that matches. For a slab on an existing frame, also note the hinge size and corner shape, square or rounded.
- Solid core vs hollow core: Hollow-core doors are lighter and easier to hang. Solid-core doors block more sound and feel more substantial, which matters for bedrooms, offices, and bathrooms, but they are heavier, so the long hinge screw becomes even more important.
- Trim plan: Decide whether you are reusing the existing casing or buying new. Old casing often splits when it comes off, so buy a few extra lengths of matching trim in case.
Removing the Old Door Unit
For a full replacement, score the paint line between the casing and wall with a utility knife, then pry the casing off gently with a flat bar, protecting the wall with a scrap of wood. Cut through the nails or shims holding the old jamb with a reciprocating saw blade slipped between jamb and stud, and the frame will come out in one piece. Check the rough opening for plumb and square before the new unit goes in.
A little time with a tape measure before you shop makes the actual inside door installation far faster, because the unit fits the first time you set it in place.