Show up to a laminate job missing one small tool and you will spend more time driving to the store than laying floor. The good news is the list is short and cheap. The tools needed to lay laminate flooring fit in a single bucket and, if you buy the budget versions, cost under $150 total. Below is the complete checklist I hand to first-timers, split into must-haves, cutting tools, and the little extras that separate a clean floor from a frustrating one.
The Core Installation Kit
These four items are the heart of any floating laminate install. You cannot lock planks together properly without them, and skipping any one leads to damaged edges or gaps at the walls.
- Tapping block ($8-$15): A hard plastic or rubber block you strike to snug plank joints tight without crushing the locking edge. Never hammer directly on a plank.
- Pull bar ($10-$20): A steel bar used to draw the last plank in a row against the wall where a tapping block will not fit. Essential for the final piece against a wall or in a doorway.
- Spacers ($5-$10 for a pack): Set the required 3/8-inch expansion gap around the perimeter. Wood shims work in a pinch, but purpose-made spacers are more consistent.
- Rubber mallet ($12-$18): Delivers controlled taps to the block. A metal hammer transfers too much shock and can chip planks.
Many home centers sell these bundled as a laminate installation kit for around $25 to $35, which is the cheapest way to get all four at once.
Cutting Tools
Every laminate job requires cutting planks for the ends of rows, around door casings, and to fit the final row to width. You have a few options depending on your budget and how much dust you want to deal with.
Circular Saw or Miter Saw
A circular saw ($40-$70) handles straight crosscuts and rip cuts. A compound miter saw ($120-$250) gives faster, cleaner end cuts and is worth renting for a big job. For laminate, use a fine-tooth blade rated 40 teeth or more to reduce chipping, and cut with the finished side down on a circular saw or finished side up on a miter saw.
Jigsaw
A jigsaw ($40-$80) is non-negotiable for curves and notches: around toilet flanges, heating vents, door jambs, and pipes. Fit it with a fine, down-cutting laminate blade so the decorative surface stays clean.
Laminate Shear Cutter
If dust and noise bother you, a manual laminate cutter ($40-$60) slices planks in one lever stroke with zero mess. It only does straight cuts, so you still need a jigsaw for notches, but it dramatically speeds up the end-of-row cutting.
Measuring and Layout Tools
Accuracy up front prevents a floor that drifts crooked by the far wall. Keep these within reach at all times:
- Tape measure ($10-$20): A 25-foot model covers most rooms.
- Speed square or combination square ($8-$15): Marks clean 90-degree and 45-degree cut lines.
- Carpenter’s pencil or fine marker ($3): A regular pencil skates on the slick laminate surface.
- Chalk line ($8-$12): Snaps a straight reference for your first row across a large room.
- 6-foot level or straightedge ($20-$40): Checks the subfloor for high and low spots before you begin.
Subfloor Prep and Safety Gear
Half of a good laminate job is what happens before the first plank. Plan for prep tools even if your subfloor looks fine, because problems hide under old flooring.
A pry bar and putty knife ($15-$25 together) let you remove baseboards and shoe molding without splitting them, so you can reinstall the same trim afterward. A shop vacuum ($50-$120) keeps the subfloor spotless, because a single pebble under a plank creates a squeak or a high spot. If your slab is uneven, budget for a bag of self-leveling compound ($30-$45) and a trowel.
Do not skip protection. Safety glasses ($5-$10) guard against flying chips at the saw, and knee pads ($15-$30) are the single best comfort purchase for a full day on the floor. A dust mask ($10) matters when you are cutting a lot of planks indoors.
Underlayment and Finishing Materials
Technically materials rather than tools, but you will stall without them. Foam or cork underlayment ($0.30-$0.60 per sq ft) cushions the floor and dampens sound, unless your planks already have an attached pad. Have your transition strips, T-moldings, and reducers on hand before install day so doorways and room boundaries finish cleanly. A utility knife with fresh blades ($8) trims underlayment and opens boxes, and painter’s tape holds underlayment seams together.
Optional Tools That Make the Job Easier
None of these are strictly required, but each one saves time or frustration on a larger install. If you are flooring more than a couple of rooms, they earn their keep:
- Table saw ($150-$400 or rent): The fastest, cleanest way to rip the final row of planks to width. If you have a lot of long rip cuts, nothing beats it.
- Oscillating multi-tool ($40-$90): Undercuts door casings and jambs so planks slide underneath for a clean, professional edge instead of an awkward notch.
- Laser level ($30-$80): Projects a straight reference line across the room, handy for keeping long runs true.
- Kneeling pad or rolling knee cart ($20-$40): Beyond basic knee pads, a padded board spreads your weight and saves your joints over a full day.
- Moisture meter ($20-$50): Confirms a concrete slab is dry enough before you lay anything over it, preventing warping later.
How Much It All Costs
Tallied up, a bare-bones kit is remarkably affordable. If you already own a jigsaw and a circular saw, you can buy the $30 installation kit, a few measuring tools, spacers, and safety gear for well under $75. Starting from nothing, expect to spend $120 to $180 to buy everything on the core list, or you can rent the power tools for a weekend to keep the outlay closer to $60.
Compare that to the $2 to $5 per square foot a professional charges for labor, and the tool investment pays for itself on a single 200-square-foot room. Better still, you keep the kit for the next project, since laminate, vinyl plank, and engineered wood all use nearly identical installation tools.
The Complete Shopping Checklist
Here is the full run-down in one place. Print it and check items off before you start so you are not making an emergency store run mid-project:
- Tapping block and pull bar
- Rubber mallet
- 3/8-inch spacers
- Circular saw or miter saw with a 40-plus tooth blade
- Jigsaw with laminate blade
- Optional manual laminate cutter
- Tape measure, speed square, chalk line, carpenter’s pencil
- 6-foot level or straightedge
- Pry bar, putty knife, shop vacuum
- Safety glasses, knee pads, dust mask
- Underlayment, transitions, utility knife
Buy, Rent, or Borrow?
Not every tool deserves a purchase. The small hand tools, the tapping block, pull bar, spacers, and mallet, are cheap enough to just buy and keep. The power tools are where you decide. If you already own a circular saw or jigsaw, you are most of the way there. If not, renting a miter saw for a weekend runs about $40 to $60, which beats buying one for a single room.
My advice for a first laminate project: buy the $30 installation kit, buy or borrow a jigsaw, rent a miter saw, and pick up a $50 manual shear cutter if you dislike dust. That combination covers everything the job throws at you, keeps your total tool spend near $150, and leaves you with a kit you can reuse the next time you tackle a floor. Having the right tools staged before you open the first box is what turns a stressful weekend into a smooth one.
Frequently Asked Questions
Can you lay laminate flooring without a power saw?
Mostly, yes. A manual laminate shear cutter handles every straight crosscut at the ends of rows without electricity, dust, or noise. Notches around door jambs, vents, and pipes still need a curved cut, so plan on a jigsaw or a fine-tooth hand saw for those, and rip cuts on the final row go much faster with a circular or table saw.
Do you need nails or glue to install laminate flooring?
No. Click-lock laminate is a floating floor, meaning the planks lock to each other and rest on the underlayment without being fastened to the subfloor. Nailing or gluing it down stops the floor from expanding and contracting, which leads to buckling. The only nails go into the baseboards or shoe molding, which are fastened to the wall, never through the planks.
How long does it take to lay laminate flooring in one room?
A first-timer can usually lay about 200 square feet of laminate in one full day once the subfloor is ready. Add time before that for moving furniture, pulling baseboards, cleaning, and leveling any low spots, plus 48 hours of acclimation for the boxes in the room if the manufacturer calls for it. Rooms with many doorways and notches take noticeably longer than open rectangles.
Prefer to explore on your own?
See how new flooring looks in your actual room in seconds — free, no signup.
Try the free Floor Studio →


